Portfolio


Warning: Illegal string offset 'short_desc' in /home/fungwei/public_html/ptk/wp-content/themes/vulcan/taxonomy-portfolio_category.php on line 14

Our Projects

Here is a list of our projects

  • Traffic Impact Assessment For Sunway Pyramid Phase 2

    The Sunway Pyramid Phase 2 project is an extension of the existing Sunway Pyramid shopping complex. The current net lettable area is 65,000m2. With the future extension, the shopping mall will have a total net lettable area of 157,300m2.

  • Traffic Impact Assessment for Palm Oil Industrial Cluster (POIC), Kuantan

    Client             :           East Coast Economic Region Malaysia Location        :           Kuantan Port City, Kuantan, Pahang   This proposed POIC development is located to the north side of Kuantan Port City that encompasses an area of approximately 610 acres is accessible through the existing Gebeng Bypass and also via the proposed road linking to Jalan Gebeng 2/5. […]

  • Traffic Impact Assessment for Dayabumi Complex

    Client             :           KLCC Holding Berhad & NRY Architects Location        :           Jalan Sultan Hishamuddin   The Dayabumi Complex is plans to refurbish the existing 36-storeys of Dayabumi Complex and 6 storeys of City Point (retail podium). In addition, a new office and hotel block will also be introduced.   Source: by NRY Architects Sdn. Bhd.

  • Traffic Impact Assessment Study for Penang Sentral

    Client             :          Malaysian Resources Cooperation Berhad, Pelaburan Hartanah Berhad, Penang Sentral Sdn. Bhd. Location      :        Butterworth, Penang A new centre of connectivity is fast appearing where a new hub for integrated transportation, integrating rail, ferry and bus services, will soon rise in the north. Serving as the centre […]

  • Traffic Impact Assessment Study for Setiawalk, Puchong

      Client             :           Bandar Setia Alam Sdn. Bhd. Location        :           Puchong, Selangor Setiawalk promises to transform the face of Puchong by introducing a revolutionary lifestyle experience for residents and shoppers alike. This integrated residential and commercial development, positioned as a one-stop lifestyle centre, occupies 21 acres of prime land in the matured township of Pusat […]

  • Traffic Impact Assessment Study For Platinum Park, Jalan Stonor, Kuala Lumpur

      Client             :           Naza TTDI Sdn. Bhd. Location      :           Jalan Stonor, Kuala Lumpur Platinum Park is one of the largest integrated mixed developments in the heart of Kuala Lumpur, second only to the KLCC. Rising from 9.1 acres of freehold land, it is poised to be the new icon of the city’s […]

Page 1 of 212


L13A-01-02, Level 13A
PJX HM-Shah Tower
No. 16A, Persiaran Barat
46050 Petaling Jaya,
Selangor Darul Ehsal,
Malaysia


Email: trafik@ptk.my
Phone (603)79323266 Fax (603)79323261